Pre-Regulatory Landfill Closure – North Carolina
Soil was treated on site to optimize cost and disposed off site. Land was purchased by the town for a Greenspace and nature path.
Soil was treated on site to optimize cost and disposed off site. Land was purchased by the town for a Greenspace and nature path.
Soil was treated on site to optimize cost and disposed off site. Land was purchased by the town for a Greenspace and nature path.
Former scrap yard soil was treated onsite and disposed of at a non-hazardous sub-title-D landfill.
EnviroBlend® managed the construction activities at East Penn Manufacturing, including excavation, stabilization, placement, and structural compaction of over 30,000 tons of lead-contaminated soil and battery casings at an acid battery manufacturing plant. EnviroBlend also managed the remedial closure of two solid waste units, placing stabilized soil and battery casings into the former ore [...]
Development and implementation of a stabilization approach to treat marsh area formerly used as a shooting range.
Stabilization of lead-impacted soil to meet the Toxicity Characteristic (TC) criteria for lead, recycle lead bullets, and restore the berm for future use.
EnviroBlend was used for the stabilization of 47,000 tons of soil in area consisting of residential, commercial, industrial, wetlands and woodlands
Remediation to treat lead contamination at shooting range using EnviroBlend 20/80 coarse
Remediation to treat lead-impacted backstop soil using EnviroBlend 20/80 coarse
Remediated 2,400 tons of lead contaminated soil from municipal firing range by stabilizing the soil with the use of “EnviroBlend” and transporting stabilized soils to local land fill.
Treated approximately 2,000cubic yards of soil in stockpiles ex-situ
Treated over 500 tons of lead-affected soil from a former police pistol range
Treated soil containing lead totals of 9,900 mg/kg that was leaching at 71.3 mg/L with bullets remaining in the soil.
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative.
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative
Performed treatment at less than 90 percent of budget estimate.
Nuclear weapons manufacturing plant
Project was performed for a final cost of $7 million versus the preliminary cost estimated at $12-$25 million