Remediated 55,000 cu. yd. of battery reclaiming residue in situ, at this Wausau Battery Site. EnviroBlend was able to use conventional construction equipment to mix materials, including some material below the water table. Monitoring has confirmed that treatment chemicals at this Wausau Battery Site have not affected the groundwater. Reduced costs by approximately 55% by utilizing approved field screening method and a mobile lab for determining lead and treatment additive concentrations. Avoided RCRA hazardous waste permitting requirements. Reduced overall remediation costs by $10-15 million compared to traditional (dig and haul) alternatives.