Marina Cliffs Former Barrel Superfund Site – Wisconsin
EnviroBlend reduced TCLP-chromium from hazardous limits to near the detection limits at this Wisconsin Superfund Site.
EnviroBlend reduced TCLP-chromium from hazardous limits to near the detection limits at this Wisconsin Superfund Site.
The New York State Department of Environmental Conservation (NYSDEC) used EnviroBlend to remediate soil contaminated with cadmium and remove it offsite. TCLP levels prior to treatment were leaching above the TCLP standards. The use of EnviroBlend helped NYSDEC save $30,000 while working to restore the Erie Canal Frankfort Section in New [...]
Treatment of over 60,000 tons of lead-contaminated soil at a Florida Superfund site.
Successfully treated with only 2% dosage of EnviroBlend chemistry.
Treated approximately 200,000 tons of soil ex-situ at significant savings over alternative remediation technologies. Site management allowed different areas to be treated at different dosage rates resulting in a very cost-effective approach. Interested in more stories like this? Fill out the form below for a free download. [...]
EnviroBlend® was used to remediate 38,000 cubic yards of soil with a pugmill. Treated material was disposed of off-site at a Subtitle D landfill. The project averaged throughput of 1,000 tons per day and reduced bulking of treated material by over 7,500 tons compared to treatment with Portland cement. In total, the client [...]
EnviroBlend® treated over 11,000 tons of lead-hazardous soil ex-situ at a former salvage yard. A low dosage rate resulted in reduced cost for transportation and disposal of treated soil. Treated material was disposed of off-site in a Subtitle D and TSCA landfill. The project was completed in less than seven working days. [...]
On-site stabilization with EnviroBlend recently saved a large railroad company over $8 million dollars in hazardous waste transportation and disposal costs
Former scrap yard soil was treated onsite and disposed of at a non-hazardous sub-title-D landfill.
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative
Project was performed for a final cost of $7 million versus the preliminary cost estimated at $12-$25 million
Sampling found arsenic as high as 220 mg/L.
65,000 tons of contaminated soil excavated and staged