Speakman Company Foundry Sand Site – Delaware
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative
Performed the project at one half the cost of the alternative
Performed treatment at less than 90 percent of budget estimate.
Nuclear weapons manufacturing plant
Project was performed for a final cost of $7 million versus the preliminary cost estimated at $12-$25 million
Excavation along with in-situ EnviroBlend remediation
C Comp and D Comp samples resulted in 1,170 mg/kg and 4,900 mg/kg TCLP arsenic, respectively.
A dosage rate of 1% wt./wt. EnviroBlend HXD reduced arsenic leachability to 0.69 mg/L
Successfully treated soil with only 2 percent dosage of EnviroBlend®
Treated 750 tons of arsenic-impacted soil.
Soil was rendered non-hazardous and reused on the site, saving approximately $1 million.
Sampling found arsenic as high as 220 mg/L.
Site soils ranging from 1,000 mg/kg to 5,000 mg/kg arsenic, leaching from nonhazardous to over 30 mg/L.
Low dosage saving the owner considerable off-site disposal costs
Completed on time, within budget, with a cost savings of $2.82 million.
In Florida, laboratory treatability studies were conducted to evaluate the nickel-stabilizing capacity of various soil amendments for the purpose of enhancing the attenuation of dissolved nickel from industrial wash water derived from operations at a power plant fired with Number 6 fuel oil. The wash water, containing an average nickel concentration of 10 mg/L, percolated [...]
65,000 tons of contaminated soil excavated and staged
In situ treatment and soil fixation of over 11,000 tons of hazardous lead contaminated soil