Copper Smelting Facility – Australia
Overall percentage of batches passing the TCLP after a single treatment exceeded 95 percent.
Overall percentage of batches passing the TCLP after a single treatment exceeded 95 percent.
Significant cost savings on raw material inputs
Completed on time, within budget, with a cost savings of $2.82 million.
In situ treatment and soil fixation of over 11,000 tons of hazardous lead contaminated soil