Aluminum Smelter – Southern U.S.
An aluminum smelter in the southern US uses EnviroBlend 90/10 CS to treat cadmium and lead-contaminated aluminum dust.
An aluminum smelter in the southern US uses EnviroBlend 90/10 CS to treat cadmium and lead-contaminated aluminum dust.
A smelting plant recently started using EnviroBlend Emag 33 to treat 45 annual tons of lead-contaminated dust and hydrogen chloride gas.
An aluminum smelter facility has been using EnviroBlend for the past five years to annually treat 500 tons of lead-contaminated dust.
An aluminum smelter facility manufacturing aluminum ingots has been using EnviroBlend AG20 for over 20 years.
Another western U.S. smelter has enjoyed cost savings by switching away from hydrated lime to magnesia-based chemistries.
A CA Smelter is enjoying significant cost savings on both the reagents used and the disposal of the waste generated using EnviroBlend.
Customer found significant cost savings using EnviroBlend AG treatment as a replacement for straight hydrated lime.
Lead-contaminated soil was treated at this old industrial site at 6% dosage of EnviroBlend®. Interested in more stories like this? Fill out the form below for a free download. The EnviroBlend Advantage
Overall percentage of batches passing the TCLP after a single treatment exceeded 95 percent.
Significant cost savings on raw material inputs
The overall weight and cost of the waste disposal was reduced substantially with a switch to EnviroBlend®
EnviroBlend tested against calcium silicate cement